Vote Home About John Legislation News Constituent Services Email Contact Make a Difference
John Miller for Senate

HRBT Work Continues Days After Pump Failure

To watch the story click here: watch

There was a problem with the pumps inside the tunnel that resulted in several inches of water collecting inside the tunnel during Thursday's commute.

Posted on WVEC.com July 6, 2009

<<< Back to News

Copyright 2010 | Paid for and Authorized by John Miller